Presentations, posters, and papers from the workshop are available in PDF format sorted by session. The full agenda document is available.
- Session 1: Satellite tracking and scheduling
- Session 2: Performance evaluation
- Session 3: Accuracy and scheduling
- Session 4: Automation and autonomous station operation
- Session 5: Wrap-Up
- SLR station visit
- Posters
The following icons are used for the on-line proceedings documentation:
All files for the proceedings are stored in Adobe PDF format. The proceedings from this workshop will not be published in hardcopy form. Abstract/paper numbers were assigned and are included in the listing of papers below. To cite a paper from the workshop, please use the following format:
<<Author name(s)>>, <<Paper Title>>, presented at the 2017 ILRS Technical Workshop, Riga, Latvia, October 02-05, 2017.
Authors are asked to read the instructions for submitting papers for the web proceedings.
Sunday, October 01, 2017 | ||||||||
15:00 - | 18:00 | Registration | ||||||
09:00 - | 16:00 | Analysis Standing Committee meeting | ||||||
16:00 - | 18:00 | ILRS Governing Board meeting | ||||||
Monday, October 02, 2017 | ||||||||
Session 0: Workshop Welcome | ||||||||
09:00 - | 09:30 | Riga station history (K. Salmins) | ||||||
Session 1: Satellite tracking and scheduling | ||||||||
Chairs: Mike Pearlman, Carey Noll, Jens Steinborn, Frank Lemoine | ||||||||
Session 1A - Overview | ||||||||
09:30 - | 09:40 | Introduction (M. Pearlman) | ||||||
09:40 - | 10:00 | What is the role of GGOS and the ILRS role in GGOS (M. Rothacher/M. Pearlman) | ||||||
10:00 - | 10:15 | Results of the ILRS User Survey (M. Pearlman) | ||||||
10:15 - | 10:30 | Break | ||||||
Session 1B - Requirements by Discipline | ||||||||
10:30 - | 10:45 | Requirements for the ITRF (E. Pavlis) | ||||||
10:45 - | 11:00 | Requirements for Altimeter Missions (F. Lemoine) | ||||||
11:00 - | 11:15 | Requirements for GNSS (Galileo, GLONASS, Beidou, etc.) (G. Bury) | ||||||
11:15 - | 11:30 | Requirements for GLONASS (M. Sadovnikov/V. Shargorodskiy) | ||||||
11:30 - | 11:45 | Requirements for CubeSat (M. Rothacher) | ||||||
11:45 - | 12:00 | Requirements for Supporting Other Applications (time varying gravity field, atmospheric drag) (T. Otsubo/M. Blossfeld) | ||||||
12:00 - | 13:00 | Lunch | ||||||
Session 1C - Current ILRS Network Performance | ||||||||
13:00 - | 13:15 | Review of ILRS Network Performance (M. Pearlman) | ||||||
13:15 - | 13:30 | Rating Station Performance (E. Hoffman) | ||||||
13:30 - | 13:45 | Setting ILRS Tracking Priorities (M. Pearlman) | ||||||
13:45 - | 14:15 | Discussion | ||||||
14:15 - | 14:45 | Break | ||||||
Session 1D - ILRS Network Procedures | ||||||||
14:45 - | 15:00 | Issues with Satellite Predictions (J. Steinborn/G. Appleby) | ||||||
15:00 - | 15:15 | Impact of Supporting Other Applications (G. Kirchner/G. Appleby) | ||||||
15:15 - | 15:25 | Long Term View (M. Pearlman) | ||||||
15:25 - | 15:45 | Poster Briefs (2 min each) | ||||||
16:00 - | 18:00 | Data Formats and Procedures Standing Committee meeting | ||||||
18:00 | Ice Breaker | |||||||
Tuesday, October 3, 2017 | ||||||||
08:00 - | 09:00 | Transponder Standing Committee meeting | ||||||
Session 2: Performance evaluation | ||||||||
Chairs: Erricos Pavlis, Toshi Otsubo, Horst Mueller, Cinzia Luceri | ||||||||
Session 2A - Overview & Ongoing ASC Efforts | ||||||||
09:00 - | 09:15 | Introduction (E. Pavlis) | ||||||
09:15 - | 09:35 | The ILRS ASC Pilot Project on systematic error estimation (C. Luceri) | ||||||
09:35 - | 09:50 | BKG’s Contribution to the ILRS Pilot Project on Systematic Errors (D. Koenig) | ||||||
09:50 - | 10:20 | Break | ||||||
Session 2B - State of the Network and Sources of Errors | ||||||||
10:20 - | 10:35 | Evaluation of the present SLR tracking stations (H. Mueller) | ||||||
10:35 - | 10:55 | SLR error sources in the kHz repetition era: How should we improve the range measurement and the products? (T. Otsubo) | ||||||
10:55 - | 11:15 | Variability of LAGEOS normal point sampling: causes and mitigation (J. Rodríguez) | ||||||
11:15 - | 11:35 | Effect of pulse length, rise time, signal strength, and type of detection system on the range correction for LAGEOS-2 (D. Arnold) | ||||||
11:35 - | 12:00 | Discussion | ||||||
12:00 - | 13:00 | Lunch | ||||||
Session 2C - Hardware & External Tools to Improve Performance | ||||||||
13:00 - | 13:20 | From Time Transfer by Laser Ranging to space geodetic products (A. Belli) | ||||||
13:20 - | 13:40 | Methods to increase ranging performance and accuracy implemented in the Russian new generation laser station ‹‹Tochka›› (S. Martynov) | ||||||
13:40 - | 14:00 | Discussion | ||||||
14:00 - | 14:30 | Break | ||||||
Session 2D - ILRS Tools for Network Support | ||||||||
14:30 - | 14:50 | JCET Tools for the Assessment of the ILRS Stations’ Performance (E. Pavlis) | ||||||
14:50 - | 15:10 | GOVUS – a new on-line tool for the evaluation of SLR observations to GPS, GLONASS, Galileo, BeiDou and QZSS (R. Zajdel) | ||||||
15:10 - | 15:30 | The ILRS Rapid Service Mail a tool to inform stations quickly about potential problem (T. Otsubo) | ||||||
15:30 - | 16:00 | Discussion/Closing Remarks | ||||||
16:00 - | 17:00 | Networks & Engineering Standing Committee meeting | ||||||
17:00 - | 18:00 | Missions Standing Committee meeting | ||||||
Wednesday, October 04, 2017 | ||||||||
08:00 - | 09:00 | Space Debris Study Group meeting | ||||||
Session 3: Accuracy and scheduling | ||||||||
Chairs: Evan Hoffman, Kalvis Salmins, John Degnan, Ludwig Grunwaldt | ||||||||
Session 3A - What are the factors that are currently limiting performance (data quantity and quality)? | ||||||||
09:00 - | 09:05 | Introduction (E. Hoffman) | ||||||
09:05 - | 09:20 | Survey Results and Discussion (E. Hoffman) | ||||||
09:20 - | 09:40 | Discussion - Tools for tracking performance and reporting problems | ||||||
09:40 - | 10:00 | Transitioning the NASA SLR network from the Time Interval Mode to Event Timing Mode with improved Data quality and quantity (T. Varghese) | ||||||
10:00 - | 10:30 | Break | ||||||
10:30 - | 10:45 | Challenges to Achieving Millimeter Accuracy Normal Points in Conventional Multiphoton and kHz Single Photon SLR Systems (J. Degnan) | ||||||
10:45 - | 11:00 | Single versus multi-photon SLR using SPAD detectors (I. Prochazka) | ||||||
Session 3B - Normal Point Generation | ||||||||
11:00 - | 11:30 | Discussion - Do we need a better or a more satellite and station specific definition of the NP? | ||||||
11:30 - | 11:55 | Discussion - Occurrences of simultaneous LAGEOS/Cannonball Tracking, what do we get out of this? Should this be further studied? | ||||||
11:55 - | 12:00 | Correlation of histograms for LAGEOS with actual returns (D. Arnold) | ||||||
12:00 - | 13:00 | Lunch | ||||||
Session 3C - Hardware & External Tools to Improve Performance | ||||||||
13:00 - | 13:15 | Delay compensated Optical Time and Frequency Distribution for Space Geodesy (U. Schreiber) | ||||||
13:15 - | 13:30 | Time Bias Analysis and Prediction: a Prototype Service (S. Bauer) | ||||||
13:30 - | 13:45 | Sky Clarity Comparison between Riga and Metsahovi SLR Stations (J. del Pino) | ||||||
13:45 - | 14:00 | Discussion - Should the ILRS provide individual tracking schedules for clustered stations to optimize satellite coverage? | ||||||
14:00 - | 14:30 | Break | ||||||
Session 3D - Poster Session | ||||||||
14:30 - | 16:00 | Poster session | ||||||
18:00 - | 21:00 | Workshop dinner | ||||||
Thursday, October 05, 2017 | ||||||||
Session 4: Automation and autonomous station operation | ||||||||
Chairs: Jan McGarry, Georg Kirchner, Chris Moore, Pierre Lauber | ||||||||
Session 4A - Introduction and Current State of the ILRS | ||||||||
Introduction (J. McGarry) | ||||||||
09:00 - | 19:15 | Automatic scheduling of satellite passages at the SOS-W (S. Riepl) | ||||||
09:15 - | 09:30 | OOOS: A hardware-independent SLR control system (D. Hampf) | ||||||
09:30 - | 09:45 | Potsdam automation (S. Bauer) | ||||||
09:45 - | 10:00 | The new Korean SLR system and its automatic operation (H. Lim) | ||||||
10:00 - | 10:10 | Automated operations in Changchun station: current (part I) (Z. Liang) | ||||||
10:10 - | 10:20 | Mt. Stromlo experience gained with automation: part I (C. Moore) | ||||||
10:20 - | 10:35 | Discussion – Based on the talks and other experiences, what automation is now working/operation in ILRS stations |
||||||
10:35 - | 11:00 | Break | ||||||
Session 4B - What is Planned for the Next 5 | ||||||||
11:00 - | 11:10 | Mt. Stromlo automation in progress: part II (C. Moore) | ||||||
11:10 - | 11:20 | Automated operations in Changchun station: plans (part II) (Z. Liang) | ||||||
11:20 - | 11:30 | Plans for a fully automated SGSLR system: part I (J. McGarry) | ||||||
11:30 - | 11:45 | SGSLR acquisition and tracking automation (E. Hoffman) | ||||||
11:45 - | 12:00 | Discussion – Based on the talks, what looks like it might work for other stations? What are the plans for other stations? |
||||||
Session 4C - Bringing Automation to More ILRS Stations | ||||||||
12:00 - | 12:15 | Optimization of Automated Tracking with Situational Awareness (T. Varghese) | ||||||
12:15 - | 12:30 | When Does Automation Make Sense? (R. Ricklefs) | ||||||
12:30 - | 12:45 | Scheduling for the future NASA SGSLR Network (off-shoot of abstract submitted to session 3) (J. Horvath) | ||||||
12:45 - | 13:15 | Discussion – Getting automation to more ILRS stations. Is it for everyone? Where should we be attempting to go? |
||||||
13:15 - | 14:30 | Lunch | ||||||
Session 4D - Future of Automation in the ILRS and Issues Related to Automation | ||||||||
14:30 - | 14:45 | Plans for a fully automated SGSLR system: part II (future of SGSLR Network) (J. McGarry) | ||||||
14:45 - | 15:00 | Safety/Security Concerns when Automating SLR Systems (S. Wetzel/H. Donovan) | ||||||
15:00 - | 15:30 | Discussion – What are the big issues in getting SLR systems fully autonomous? How automated will the ILRS be in 10 years? Where would we like to be? What is realistic? |
||||||
Session 4E - Posters | ||||||||
15:30 | 16:00 | Break | ||||||
Session 5: Wrap-Up | ||||||||
Chairs: Mike Pearlman, Kalvis Salmins | ||||||||
Workshop and Session Summaries | ||||||||
16:00 - | 16:10 | Session 1 (Satellite Tracking and Scheduling) Summary (M. Pearlman) | ||||||
16:10 - | 16:20 | Session 2 (Performance Evaluation) Summary (E. Pavlis) | ||||||
16:20 - | 16:30 | Session 3 (Accuracy and Scheduling) Summary (E. Hoffman) | ||||||
16:30 - | 16:40 | Session 4 (Automation and Autonomous Station Operation) Summary (J. McGarry) | ||||||
16:40 - | 16:55 | Workshop Summary and Resolutions (M. Pearlman) | ||||||
Standing Committee/Study Group Summaries | ||||||||
16:55 - | 17:05 | Analysis SC Summary (E. Pavlis) | ||||||
17:05 - | 17:15 | Data Formats and Procedures SC Summary (H. Mueller) | ||||||
17:15 - | 17:25 | Transponder SC Summary (U. Schreiber) | ||||||
17:25 - | 17:35 | Networks and Engineering SC Summary (G. Kirchner) | ||||||
17:35 - | 17:45 | Missions SC Summary (T. Otsubo) | ||||||
17:45 - | 17:55 | Space Debris SG Summary (G. Kirchner) | ||||||
Other | ||||||||
17:55 - | 18:00 | 21st International Workshop on Laser Ranging Plans (J. Bennett/M. Fulton) | ||||||
18:00 - | 18:15 | Discussion (M. Pearlman/Kalvis Salmins) | ||||||
18:15 | Workshop Close | |||||||
Friday, October 06, 2017 | ||||||||
09:00 - | 12:30 | SLR station visit - limit 25 per group. Immediately after station visit there will be an option to go straight from SLR station to airport if necessary. |
36 abstracts of 50 presentations
50 presentations
20 papers of 50 presentations
Posters
22 abstracts of 26 posters
26 posters
3 papers of 26 posters