ILRS Logo, International Laser Ranging Service

International Laser Ranging Service

A service of the International Association of Geodesy

Search:

IAG | GGOS

Skip Navigation (press 2)
  • About ILRS
    • Recent News
    • Meetings
    • Organization
    • Terms of Reference
    • Membership
    • ILRS Workshops
    • Publications & Reports
    • Links
    • Early History of ILRS
  • Network
    • List of Stations
    • Site Information
    • Site Procedures
    • System Performance
    • Networks and Engineering Standing Committee
    • Space Debris Study Group
    • Quality Control Board
  • Missions
    • List of Missions
    • Spacecraft Parameters
    • Mission Support
    • Mission Operations
    • Missions Standing Committee
  • Science
    • Analysis Centers
    • Analysis Products
    • Analysis Standing Committee
    • Bibliography
    • Data Analysis Resources
    • LARGE Study Group
    • Quality Control Board
    • Science Contributions
    • Scientific Meetings
    • SLR Science Campaigns
      • Galileo for Science
  • Data & Products
    • Data Centers
    • Data
    • Products
    • Predictions
    • Formats
    • Data Center Operations
    • Data Formats and Procedures Standing Committee
  • Technology
    • Laser Ranging
    • Ground Segment
    • Space Segment
    • Modeling
    • Software
    • Network and Engineering Standing Committee
    • Transponder Standing Committee
  • Analysis Centers
  • Analysis Products
  • Analysis Standing Committee
    • Activities and Meetings
    • Pilot Projects
  • Bibliography
  • Data Analysis Resources
  • LARGE Study Group
  • Quality Control Board
  • Science Contributions
  • Scientific Meetings
  • SLR Science Campaigns
    • Galileo for Science

Quick Links

  • ILRS Products
  • ILRS Analysis Centers
  • Lunar Science
  • Station Quarantine List
  • Network Site Information

Analysis Standing Committee (ASC) Pilot Projects

The Analysis Standing Committee has participated in these pilot projects designed to improve the quality of laser ranging analysis results:

  • POSitions and Earth Orientation Parameters (POS+EOP)
  • Harmonization of Quality Control (QC) results
  • Software Benchmarking and Orbits
  • Determination of potential systematic range errors in the ILRS stations
  • 2019 SLR Etalon-1 and -2 tracking campaign
    • Proposal for the Etalon tracking campaign
    • Weekly reports for the 2019 Etalon tracking campaign
      • Week 1: February 15-22
      • Week 2: February 15-March 01
      • Week 3: February 15-March 08
      • Week 4: February 15-March 15
      • Week 5: February 15-March 22
      • Week 6: February 15-March 29
      • Week 7: February 15-April 05
      • Week 8: February 15-April 12
      • Week 9: February 15-April 19
      • Week 10: February 15-April 26
      • Week 11: February 15-May 03
      • Week 12: February 15-May 10

The status of these pilot projects are reviewed during the ILRS Analysis workshops.

NASA Logo, National Aeronautics and Space Administration
  • NASA Official: Frank Lemoine
  • Web Developers: 610 Web Dev
  • Contact Us
  • Last modified date: May 15, 2019
  • Privacy Policy & Important Notices
WDS logo IAG-GGOS logo