International Laser Ranging Service
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||
1. |
Welcome and Introduction |
Wolfgang Seemueller |
2. |
Membership |
Wolfgang Seemueller |
3. |
Review of CB Activities |
Michael Pearlman? |
4. |
Refraction Study Group Report |
Stefan Riepl |
5. |
Formats Study Group Report |
Randy Ricklefs |
6. |
FR data delivery |
Maury Dube, Wolfgang Seemueller |
7. |
Filenaming and directory change at CDDIS |
Maury Dube |
8. |
Normal Point data format and integrity check |
Wolfgang Seemueller |
9. |
Pass list format for Gravity Probe-B |
Werner Gurtner |
10. |
More frequent ONP data exchange? |
Wolfgang Seemueller |
11. |
Urgent Mail/Prediction Exploder satisfying? |
Wolfgang Seemueller |
12. |
Working Group Charter/WG Activities |
Wolfgang Seemueller |
Attendees: Werner Gurtner, Stefan Riepl, Maury Dube, David Carter, Jan McGarry, Julie Horvath, Mark Davis, Bud Donavan, Randy Ricklefs, John Luck, Chris Moore, Mike Pearlman, Wolfgang Seemüller
1. Welcome and Introduction
W. Seemüller welcomed the attendees, and gave short remarks about the work done since the last Working Group meeting in Nice, April 2003.
2. Membership
Roger Wood has retired and is withdrawn from the list of WG members. Thanks to him for his excellent work done in this group. Maury Dube was added to the membership list.
3. Review of CB Activities
Mike Pearlman gave a short report on the activities of the Central Bureau. He reports that SLR is not getting proper recognition in papers and reports that are being issued by the analysis and science community. A notification should be put on the ILRS web site and at the EDC web page too. The Station Qualification procedure has been implemented. The recent NASA budget reduction result in closure of the SLR stations Arequipa and Maui, and cutbacks for stations Monument Peak and McDonald. Concerning the satellite predictions some duplications occur. CB will prepare a list of recommended prediction sets. The formerly report cards were produced by Van Husson, who is not working anymore for the ILRS. This work will be replaced by RITSS soon.
4. Refraction Study Group and 5. Format Study Group
The most important work is done in these two Study Groups of the DF&P WG. See the two special reports by the chairs of these Study Groups Stefan Riepl and Randy Ricklefs .
6. Full-Rate data delivery
Still some problems are existing with some SLR stations due to format, filenaming and delivery errors. Automatic archiving and handling is problematic therefore. AI: E-mail to the corresponding stations
7. Filenaming and directory change at CDDIS (and EDC)
Carey Noll and Maury Dube presented a poster in San Fernando about these changes. The changes have to be fitted to requests of the ACs
8. Normal point data format and integrity check
Wolfgang Seemueller reports about the normal point data format and integrity check at EDC. It is implemented, and the program and a description is put to the ftp server at EDC/DGFI.
9. Pass list format for Gravity Probe - B
A first format description of the pass list for Gravity Probe - B was given by Werner Gurtner. The final format will be available soon. A similar pass list is necessary for problematic satellites due to damages of other satellite equipments (e.g. ICESAT).
10. More frequent ONP data exchange
The same exchange frequency of ONP data should be at both Global ILRS Data Centers CDDIS and EDC. Wolfgang Seemüller will make the correspondent arrangements for coordination of the equal data exchange at both centers.
11. Urgent Mail/Prediction Exploder satisfying?
After the transition of the Prediction Exploder from CDDIS/HTSI to EDC nobody is blaming, so all seem to be satisfied. No comments were given.
12. Working Group Charter/WG Activities
No changes Finally our former chair of the DF&P WG John Luck presented his research about the multi-colour normal point generation. He was asked to formulate a recommendation about this item (see attachment). The recommendation is under review by the members of the DF&P WG. Additionally he formulates a workshop resolution (see attachment). Thanks to John for his excellent work.
From : DATA FORMATS AND PROCEDURES WORKING GROUP
To : ILRS
Central Bureau
On: The 1997 ILRS Normal
Point (NP) Algorithm
Considering that:
Item (1) of the published algorithm
reads:
"Use high precision predictions to generate prediction residuals PR j =
O j - P j where j indexes all returns in the pass . ."; and that:
Item
(3) of the published algorithm reads:
"Solve for a set of parameters . .
. to remove the systematic trends of the prediction residuals, giving the
trend function f(PR); and that:
Item (4) of the published algorithm reads:
"Compute fit residuals FR j = PR j - f(PR j ) and omit outliers";
and
Noting that:
inappropriate interpolation methods can introduce
serious errors in the predictions P j and therefore in the prediction residuals
PR j leading to errors in Normal Points as great as one-third of the amplitude
of the prediction error in any bin,
Recommends that :
Reference : http://ilrs.gsfc.nasa.gov/products_formats_procedures/normal_point/np_algo.html
JMcKL, 10 June 2004
Item 7 added 19 June 2004
The 14 th International Workshop on Laser Ranging,
JMcKL, 19 June 2004
Responsible Government Official: Carey Noll
NASA's Privacy Policy and Important Notices
Send us your comments